On September 29, the second batch of Fixed Mine car equipment was loaded in the second workshop of China Coal Group's intelligent equipment production and manufacturing, and then will be sent again to
On September 22,a batch of fixed mining car equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and then sent to a mine in Anhui.The fixed mining car shipped t
On August 26, a batch of Fixed Mining Car equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and sent to a mine in Xining, Qinghai. The Fixed Mining Car shipp
On August 30, a batch of single hydraulic prop equipment for mining is loaded in the fourth workshop of China Coal Group's intelligent equipment manufacturing and will be sent to a mine in Tongchuan,
On August 26, a batch of Fixed Mining Car equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and sent to a mine in Xining, Qinghai. The Fixed Mining Car shipp
On August 21, a batch of mining flat cars was loaded in the second workshop of China Coal Group's intelligent equipment production and manufacturing and then will be sent to a mine in Guizhou. Over th
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen